Skip Ribbon Commands
Skip to main content

Environmental Assessment (EA) Studies

EA studies provide for the protection, conservation and wise management of Ontario's environment by evaluating the potential environmental effects of a project or undertaking before decisions are made about proceeding.

Studies Currently Underway * Initiated

Bell Farm Road & Ross/Collier/Bayfield Streets Transportation Improvements
Purpose: Develop design alternatives based on the Multi-modal Active Transportation Master Plan recommendations to implement the noted improvements.

2016

Sophia Creek Watershed & Mulcaster Drainage Area
Purpose: Consider design alternatives and establish the preferred recommended design alternative for drainage improvements within the Sophia Creek Watershed.

2016

Bayview Drive & Big Bay Point Road Transportation Improvements
Purpose: Consider design alternatives and establish the preferred recommended design alternative for transportation improvements on Bayview Drive (Little Ave to Big Bay Point Rd) and Big Bay Point Road (Bayview Dr to Huronia Rd).

2015

Hewitt's Secondary Plan Area Transportation Improvements
Purpose: Consider design alternatives, consult public and establish the preferred recommended design alternative for transportation improvements in the Hewitt's Secondary Plan Area.

2015

McKay Rd East / Hwy 400 Interchange, Lockhart Rd / Salem Rd Highway 400 Crossing
Purpose: Consider design alternatives, consult public and establish the preferred design alternative for transportation improvements on McKay Road East - Highway 400 Interchange, Lockhart Road/Salem Road Highway 400 Crossing and associated works.

2015

Salem Secondary Plan Area Transportation Improvements
Purpose: Consider design alternatives, consult public and establish the preferred recommended design alternative for transportation improvements in the Salem Secondary Plan Area.

2015

Comprehensive Stormwater Management Master Plan (CSWM-MP)
Purpose: Consider alternative stormwater management strategies to improve stormwater quality, water balance and erosion control.  This study also includes a preliminary assessment of alternative funding sources to operate a financially sustainable stormwater management system.

2014

Duckworth Street Transportation Improvements
Purpose: Consider design alternatives for implementing bike lane and improve active transportation on Duckworth Street from Bell Farm Road to St Vincent Street.

2014

Bryne Drive (Caplan to Essa) Master Plan Update 
Purpose: Reassess roadway alignment alternatives for a proposed five-lane road extension of Bryne Drive between Caplan Avenue and Essa Road.

2008
* For information on previous studies, please visit Completed Environmental Assessments.

Looks like your screen is a bit too small

The page you are attempting to view is not currently compatible with the dimensions of your device. Please visit this page on a larger screen.