​Anne St Transmission
Watermain Abandonment

Abandonment of a 400mm diameter transmission watermain crossing Highway 400 at Anne St to allow the replacement of the Anne/400 bridge by MTO in 2021.

Project Features

Summary of overall objective of the project:

  • Disconnect existing watermain on each side Highway 400.
  • Connect existing main to other mains to avoid leaving dead ends
  • Restoration as required

Affected Services

There should be no affect on existing services,

Schedule

June 2020: Tendering
July to September: Construction

Traffic Impacts

The connections on the south side of Highway 400 are within the Anne/Donald/Wellington intersection.  Lane closures on Anne and Donald will be required from time to time.


 