Road Construction Project, #EN1101

Dunlop / Berczy / Poyntz Watermain

The project is being prompted by the need to install a transmission watermain to service the east end of Barrie. The existing infrastructure along the roadway is also nearing the end of its useful life and requires replacement.

Project includes rehabilitation of old infrastructure and improvents to the water distribution system including improved fire flows in the area. The project is expected to be tendered with construction expected to commencing in summer 2021.

Impacted Road Segments

  • Poyntz From Collier St. to Eugenia St.
  • Berczy From Poyntz St. to Codrington St.
  • Poyntz From Collier St. to Dunlop St.
  • Dunlop From Poyntz to before Mulcaster

Anticipated Schedule

May 2021Construction Start
December 2021​Construction End

Affected Services

Generally, services will not be affected. Services such as Bell, Rogers, Enbridge, Alectra should not be affected. Occasional disruptions to the water supply may occur as the existing watermain and services to property line are being replaced.

Traffic Impacts

The work will require a local road closure. Access to local traffic and emergency vehicles will be maintained through construction.

 