The City of Barrie Multi-Modal Active Transportation Master Plan (MMATMP) identified Bayview Drive as key transportation corridor and recommended several transportation improvements to accommodate growth in Barrie to 2031.

Project Updates

April 2021
The City of Barrie Infrastructure Department has completed the 100% Detailed Design for this project. Property Acquisition is expected to occur in 2021 and 2022, with utility relocations expected in 2023. Construction is expected to start in 2024.

​May 2020
100% Detailed Design under review by the City.

Project Features

The Big Bay Point Road intersection at Bayview Drive is part of the Harvie Road/Highway 400 Crossing construction. The improvements to Bayview Drive will match the improvements being constructed at the intersection and continue north to Little Avenue.

The design improvements include:

  • Two (2) 3.5 lanes – one each northbound and southbound;
  • Continuous 4.2m two-way left turn lane;
  • 1.5m bicycle lanes on both sides of the roadway;
  • 1.8m sidewalk on the West side of the roadway; and
  • Replacement and improvement to local water and sanitary sewer services.

Schedule

2018–2020Undertaking of detailed design and preparation of Tender Ready documents
2021–2022Property Acquisition
​2023 ​Utilities
2024 Construction Start