Skip Navigation LinksBayview-Drive-and-Big-Bay-Point-Road-Transportation-Improvements Bayview Dr & Big Bay Point Rd Transportation Improvements

DESIGN PROJECT

Bayview Dr & Big Bay Point Rd
Transportation Improvements

The City of Barrie Multi-Modal Active Transportation Master Plan (MMATMP) identified Bayview Drive and Big Bay Point Road as key transportation corridors and recommended several transportation improvements to accommodate the growth of Barrie to 2031.

The City of Barrie has retained C.C. Tatham & Associates Ltd. for the provision of engineering services for the preliminary and detailed design of Bayview Drive, from Little Avenue to Big Bay Point Road (approximately 1.4 km) and Big Bay Point Road from Bayview Drive to Huronia Road (approximately 1.3 km).

Contract administration, construction inspection, commissioning and warranty administration for both projects are provisional items.

Purpose

The purpose of this project is to implement the preferred servicing solution as recommended by the Municipal Class EA process. Phases 3 & 4 of the Municipal Class EA process were completed for the study area in consideration of the physical, natural, cultural/heritage, social and economic environments.

The proposed design alternatives were evaluated in consideration of these criteria. Subsequent to this analysis and the agency and public input provided, the preferred design alternatives were chosen.

The corresponding Environmental Study Report can be found under Completed Environmental Assessment Studies.

Project Features

Bayview Drive, Little Avenue to Big Bay Point Road

  • Two 3.5m lanes – one North and one South
  • Continuous 4.2m two-way left turning lane
  • 1.5m bicycle lanes on both sides of the street
  • Variable boulevard widths
  • 1.8m sidewalk on West side only
  • Replace all water services
  • Replace entire sanitary sewer

Big Bay Point Road (Bayview Drive to Huronia Road

  • Four 3.5m lanes – two West and Two East
  • Continuous 4.2m two-way left turning lane
  • 1.5m bicycle lanes with 0.5m buffer on both sides of the street
  • Variable boulevard widths
  • 1.8m sidewalk on South side only

Schedule

2017–2018 Design

• Detailed Design commenced August, 2017. 
• Public Consultation: scheduled for February 2018. 
• Anticipated Design Completion: Summer 2018

2021   

Construction Commences on Big Bay Point Rd
2023 Construction Commences on Bayview Drive

 

Public Information Centre

A Public Information Centre (PIC) was held June 20, 2018 to present the proposed improvements and seek community feedback. This was an informal drop-in session where participants were able to review information presented, ask questions of City staff and the design team, and provide feedback to help guide the finalization of the design.

Bayview-Big Bay Point Notice of PIC

Bayview_BBPR PIC_Comment Sheet

PIC-Intersection-PPs

Bayview PIC dwgs June 20 2018

Big Bay Point PIC dwgs June 20 2018

Looks like your screen is a bit too small

The page you are attempting to view is not currently compatible with the dimensions of your device. Please visit this page on a larger screen.