RADEditorContent
Codrington Street & Lakeview Crescent Right of Way Replacement
The reconstruction of Codrington Street (Duckworth Street to Weldon Street) and Lakeview Crescent (Rodney Street to Codrington Street).
This work includes asphalt and sidewalk reconstruction, the replacement of the sanitary and stormwater infrastructure, watermains and includes replacement of underground services to the property line.
Project Updates
August 2020: Design is currently in the preliminary stage.
Project Features
- Road reconstruction,
- Watermain replacement,
- Sanitary sewer and lateral replacement,
- Storm sewer replacement
- Sidewalk installation / replacement,
- Street lighting replacement
Schedule
2021–2023 | Design |
2024 | Utility Relocations |
2025–2026 | Construction |
Looks like your screen is a bit too small
The page you are attempting to view is not currently compatible
with the dimensions of your device. Please visit this page on a
larger screen.