​Codrington Street & Lakeview Crescent Reconstruction

The reconstruction of Codrington Street (Duckworth to Weldon), Lakeview Crescent (Codrington to Rodney) and Highland Avenue (Cook to Codrington).

This work includes asphalt and sidewalk reconstruction, the replacement of the sanitary and stormwater infrastructure, watermains and includes replacement of underground services to the property line. 

The project will renew the life of the deteriorating roadway and underground services in the area as well as increase the water network capacity for the area for future growth of the city. The project will expand and upgrade the storm and sanitary sewer networks to meet City standards.

Project Updates

June 2021: Design is currently in the preliminary stage.

Project Features

See site limits.

  • Road reconstruction,
  • Watermain replacement,
  • Sanitary sewer and lateral replacement,
  • Storm sewer installation,
  • Sidewalk installation / replacement,
  • Street lighting Improvements
  • Possibility for Low Impact Development (see below)

Schedule

2021–2023 Design
2024Utility Relocations
2025–2026  Construction

Low Impact Development Opportunities

In an effort to reduce the quantity & improve the quality of stormwater runoff, the City of Barrie is considering implementing green infrastructure in this project. If you are interested in having stormwater friendly designs in your boulevard or interested in learning more about low impact development opportunities please contact Jeff Henry, Engineering Project Manager, at         705-739-4220 x4592 or jeff.henry@barrie.ca.

Affected Services

Specific information on affected services will be distributed closer to construction. Generally, services will not be affected. Services such as Bell, Rogers, Enbridge and Alectra should not be affected. Occasional impacts to drinking water will occur as the existing watermain and services to property line are being replaced.

Access to Properties

During construction all reasonable efforts would be made to maintain vehicle access to driveways. However, there may be some temporary interruptions to access during construction. Access would be restored as quickly as possible. Advanced notification would be provided to property owners prior to any driveway access restriction.

Pedestrian access would be maintained during construction.

Traffic Impacts

During the construction, some short delays (e.g. a few minutes) while driving through the construction area would be expected while equipment is maneuvering, trucks are dumping, etc. We ask for your patience in such instances.