Skip Ribbon Commands
Skip to main content
Sign In

Skip Navigation LinksDyments-Creek-Culvert-Replacement Dyments Creek Culvert Replacements & Watercourse Improvement

Design Project

Dyments Creek Culvert Replacements and Watercourse Improvement

The City is undertaking the replacement of two culverts to increase capacity for Sanford Street and Bradford Street culvert crossings and watercourse improvements from Sanford Street to downstream of Bradford Street.

Project Status

June 2020: 30% Detailed Design package under development.

Project Features

The objective of this project is to:

  • Replace the existing culverts at Bradford St and Sanford St that are in poor condition with larger culverts that can manage more water. This will help to reduce flood waters over topping Bradford St and protect our Wastewater Treatment Facility from flooding. 
  • Daylight and restore a portion of Dyments Creek from Sanford Street to downstream of Bradford. This will provide better opportunities for habitat in Dyments Creek, provide an engineered floodplain and a natural channel design.
  • Watermain modifications will be made at Sanford St.

Schedule

Public Information CentreLate 2020 or Winter 2021
​Design​2020–2021
Property Acquisition2021
Utility Relocation2022
Construction​2023–2024

Looks like your screen is a bit too small

The page you are attempting to view is not currently compatible with the dimensions of your device. Please visit this page on a larger screen.