Skip Navigation LinksHNS-Allandale-Neighbourhood-Renewal-Programs Neighbourhood Renewal Programs: HNS Allandale

Road Design Project

Allandale Neighbourhood Renewal Programs

The Historic Neighbourhood Strategy (HNS) Allandale Neighbourhood Renewal Programs, A and B, are currently in the design phase. Together, these programs include the reconstruction of infrastructure and roadways in Barrie's Allandale Neighbourhood

Allandale A Neighbourhood Renewal Program   

The Allandale A Neighbourhood Renewal Program (NRP) includes the reconstruction of all infrastructure and roadways in the HNS Allandale A Neighbourhood. The neighbourhood and infrastructure was initially constructed in the 1940’s and 1950’s and many aspects of the roadway and infrastructure are reaching the end of their life and require replacement. 

RoadwaysProject Features​Schedule

Jacobs Terr.
Innisfil–Alfred

Marcus St
Jacobs–Campbell

Alfred St
Jacobs–Campbell

Campbell St
Anne–End

Wood St
Alfred–End

Centre St
Anne–Caroline

Caroline St
Alfred–Innisfil

  • Road reconstruction
  • Watermain replacement
  • Sanitary sewer replacement
  • Sanitary lateral replacement 
  • Storm sewer replacement & upgrades
  • Local drainage improvement 
  • Major creek channel improvements 
  • Large diameter culvert replacement & upgrade
  • Sidewalk replacement
  • Traffic signal replacement 
  • Street lighting upgrades

​Design:
2018–2022

Utility Relocations:
2021–2022

Construction:
2023–2024

HNS Allandale B Neighbourhood Renewal Program

The Allandale B Neighbourhood Renewal Program (NRP) includes the reconstruction of all infrastructure and roadways in the HNS Allandale B Neighbourhood. The neighbourhood and infrastructure was initially constructed in the 1940’s and 1950’s and many aspects of the roadway and infrastructure are reaching the end of their life and require replacement.

Roadways​Project Features​Schedule

Holgate St
Innisfil–Bayview 

William St
Burton–Baldwin

Granville St
Burton–Holgate  

  • Road reconstruction 
  • Watermain replacement
  • Sanitary sewer & lateral replacement
  • Storm sewer installation / replacement / upgrading, sidewalk installation / replacement
  • Traffic signal replacement
  • Street lighting replacement

​Design:
2018–2022

Utility Relocations:
2022

Construction:
2023–2024