The project is for the removal of the sediment within the Marina at the Kidd’s Creek outlet. The sediment is blocking fish passage within the channel and is preventing eight boat slips from being used.

The removal is required to comply with Environmental Regulations.

Reason for Project:

There is excessive sediment within the outlet channel and Marina at Kidd's Creek preventing fish passage and boats access to eight Marina slips.

  • The City needs to remove the sediment with measures in place to meet Environmental Regulations.
  • The City needs to obtain multiple agency approval before this work can be completed.

Project Update

November 2021

​Aquafor Beech are working towards the 30% preliminary design submission.

Previous Updates

The City has awarded the Detailed Design for this project to Aquafor Beech Limited, they will complete all the necessary studies required to obtain all associated permits to complete the work. Prepare the detailed design drawings and contract documents.

Project Location

The outlet is in the north marina just south of the spirit catcher with the closest streets being Simcoe Street and Toronto Street.

Project Schedule

The following project schedule has been planned for this project:

Detailed DesignOctober 2021 to January 2023
ConstructionJune 2023 to October 2023