RADEditorContent
McKay Road ROW Expansion, County Rd 27 to Hwy 400
Transportation, Water and Sanitary improvements to support Phase 1 growth in the Salem Secondary Plan area. Five lane road from Reid to Hwy 400, three lane road west of Reid to Phase 1 boundary.
Project Features
The preferred design alternative for McKay Road East (see Completed Environmental Assessments for details) includes the following:
- Four 3.5 m vehicle lanes
- a 1.2 m- 4.2 m raised median, painted median, or two-way left turn lane (TWLTL)
- 1.5 m on-road bicycle lanes plus 0.5 m buffer on both sides of roadway
- 2 m wide sidewalks on both sides of roadway
- 2.9 m boulevards
- LID SWM features
- Local watermain services
- New trunk watermain (400 mm)
- New trunk sanitary sewer (525mm & 600 mm)
- Local sanitary services
- Street lighting
- Traffic Signals
Schedule
2019 |
Property acquisition |
2020 |
Construction Start (Reid St to Highway 400) |
Looks like your screen is a bit too small
The page you are attempting to view is not currently compatible
with the dimensions of your device. Please visit this page on a
larger screen.