Skip Ribbon Commands
Skip to main content
Sign In

Skip Navigation LinksMcKay-Road-ROW-Expansion McKay Rd ROW Expansion

Road Design Project

McKay Road ROW Expansion,  Country Rd 27 to Hwy 400

Transportation, Water and Sanitary improvements to support Phase 1 growth in the Salem Secondary Plan area. Five lane road from Reid to Hwy 400, three lane road west of Reid to Phase 1 boundary.

Project Features

The preferred design alternative for McKay Road East (see Completed Environmental Assessments for details) includes the following:

  • Four 3.5 m vehicle lanes
  • a 1.2 m- 4.2 m raised median, painted median, or two-way left turn lane (TWLTL)
  • 1.5 m on-road bicycle lanes plus 0.5 m buffer on both sides of roadway
  • 2 m wide sidewalks on both sides of roadway
  • 2.9 m boulevards
  • LID SWM features
  • Local watermain services
  • New trunk watermain (400 mm)
  • New trunk sanitary sewer (525mm & 600 mm)
  • Local sanitary services
  • Street lighting
  • Traffic Signals

Schedule

2019 Property acquisition
2020 Construction Start (Reid St to Highway 400)

Looks like your screen is a bit too small

The page you are attempting to view is not currently compatible with the dimensions of your device. Please visit this page on a larger screen.