Transportation and Water Improvement to support Phase 1 growth in the Salem Secondary Plan area.

Urbanize existing rural Salem Road and widen to three lanes from Country Road 27 to Essa Road. Urbanize south half of existing rural Salem Road and widen to three lanes from Essa Road to Veterans.

Project Features

The preferred design includes:

  • Two 3.5 m vehicle lanes 
  • 1.2 m– 4.2 m raised median, painted median, or two-way left turn lane (TWLTL) 
  • 1.5 m on-road bicycle lanes plus 0.5 m buffer on both sides of roadway 
  • 2 m wide sidewalks on both sides of roadway 
  • Local watermain services 
  • Linear LID considerations, as appropriate 
  • Three major water crossings 
  • New trunk watermain (500 mm)
  • Local sanitary services 
  • Street lighting 
  • Traffic Signals

Schedule

2018 Detailed design & property acquisition
2019 Utility relocation
2020 Construction start