2019 Sidewalk Infill Program

City Council has adopted a policy to promote pedestrian accessibility around the City. Within the 2019 Capital budget, the City of Barrie Engineering Department has been asked to construct sidewalks in multiple new locations.

The proposed concrete sidewalks will be placed within the City Boulevard on the streets outlined below. Considerations were given to avoid trees, driveways, and areas that would require retaining walls. Following the installation of the new sidewalks, the boulevards will be restored with; topsoil and sod, driveways repaired with asphalt, concrete, or interlock to the limit of construction, and any existing walkways or paths will be connected to the new sidewalk.

Project Features

 Planning for the construction of new sidewalks. Viewdetailed design drawings of the 2019 proposed sidewalk locations.

Sidewalk Locations

​Street​Side of Road​From ​To
​Creswick Court​North​Oak Street​Oakley Park Square
​Beecroft Court​North​Oakley Park Square​St. Vincent Street
​Bennett Road​West​Grove Street​Oakley Park Square
​Davidson Street ​West​Grove Street East​Rose Street
​Elm Street​West​Oakley Park Square​Gunn Street
​Fraser Court​North​Morrow Road​End of Cul-de-sac
​St. Vincent Square​West​Blake Street​Kempenfelt Drive
​Vancouver Street ​East ​Blake Street​Kempenfelt Drive

Schedule

Design:2018
Construction:2019