Skip Navigation LinksSophia-Creek-Culvert-Expansion Sophia Creek Culvert Replacement

Design Project

Sophia Creek at Grove Street East Culvert Replacement

Replacement of the existing culverts that convey Sophia Creek under Grove Street East. The crossing is located at Grove Street East, between Bothwell Crescent and Davidson Street.

Project Updates

June 2020: 60% Detailed Design package under development.

Project Features

The purpose of this project is to replace the existing three corrugated steel pipe culverts that are currently in poor condition. The culverts will be replaced with new corrugated steel pipe culverts of the same approximate size.

Schedule

A formal in person Public Information Session is not planned for this project. If a resident has questions or concerns regarding this work, they should contact the Project Manager directly: Angela MacLean, 705-739-4220 x4453, angela.maclean@barrie.ca.

December 2020Design to be completed
​Construction to start​July 2021