This project establishes new infrastructure including a transmission watermain and a local watermain to service residential growth and development in south-west Barrie.
This project is the first phase of infrastructure improvements to support development in the south-east section of the
Salem Secondary Plan Area. The project is currently in Detailed Design stage and will conform with the City’s Water Supply and Water Storage & Distribution
Master Plans.
Project Updates
December 2020:
- Design Status: 60% Detailed Design Stage completed, working towards 90% Design Stage
- Next Steps:
- Public Information Centre (virtual) proposed in February 2021
- Finalize design and complete tender ready documents
Project Features
The design concept includes:
-
A new 500mm transmission watermain along the east side of Veteran’s Dr
-
A new 400mm local (service) watermain along the west side of the Veteran’s Dr
-
Intersection improvements at Veteran’s Dr/Salem Rd
Project Schedule
2021 |
Detail Design Complete |
2021 |
Estimated Construction Start |
2022 |
Estimated Construction Completion: |
Related Documents & Links
Looks like your screen is a bit too small
The page you are attempting to view is not currently compatible
with the dimensions of your device. Please visit this page on a
larger screen.