This project establishes new infrastructure ​including a transmission watermain and a local watermain to service residential growth and development in south-west Barrie.

This project is the first phase of infrastructure improvements to support development in the south-east section of the Salem Secondary Pla​n A​rea. The project is currently in Detailed Design stage and will conform with the City’s Water Supply and Water Storage & Distribut​ion Master Plans​.​​​

Project Upd​at​​es 

Fall 2021:

  • On track for construction start in Spring 2022.
  • Public Information Centre (PIC) planned for January 2022 (date to be determined).​

Project Featu​res

The design concept inclu​des: 

  • A new 500mm transmission watermain along the east side of Veteran’s Dr 
  • A new 400mm local (service) watermain along the west side of the Veteran’s Dr 
  • Intersection improvements at Veteran’s Dr/Salem Rd

Project Sched​ule

​Design Complete:​2021
​Property Acquisition:​2021-2022
​Utility Relocations:​2021-2022

​Construction Start:

​Spring 2022