This project establishes new infrastructure ​including a transmission watermain and a local watermain to service residential growth and development in south-west Barrie.

This project is the first phase of infrastructure improvements to support development in the south-east section of the Salem Secondary Pla​n A​rea. The project is currently in Detailed Design stage and will conform with the City’s Water Supply and Water Storage & Distribut​ion Master Plans​.​​​

Project Upd​at​​es 

December 202​​0:

  • Design Status: 60% Detailed Design Stage completed, working towards 90% Design Stage
  • Next Steps:​
    • Public Information Centre (virtual) proposed in February 2021
    • Finalize design and complete tender ready documents

Project Featu​res

The design concept inclu​des: 

  • A new 500mm transmission watermain along the east side of Veteran’s Dr 
  • A new 400mm local (service) watermain along the west side of the Veteran’s Dr 
  • Intersection improvements at Veteran’s Dr/Salem Rd

Project Sched​ule

2021 Detail Design Complete
2021 Estimated Construction Start
2022 Estimated Construction Completion: