Skip Navigation LinksWellington-D2-Neighbourhood-Reconstruction Neighbourhood Reconstruction: Wellington D2

Design Project

Wellington D2 Neighbourhood Reconstruction

Wellington D2 Neighborhood Renewal Program (NRP) includes the reconstruction of all infrastructure and roadways in the Wellington neighbourhood. The neighbourhood and infrastructure was initially constructed in mid 1950's and many aspects of the roadway and infrastructure are reaching the end of their life and require replacement.

The project includes road reconstruction, watermain replacement, sanitary sewer replacement, sanitary lateral replacement, storm sewer replacement and upgrades, local drainage improvements, sidewalk replacement/installation and street lighting upgrades.

Affected Streets

  • Dundonald (Codrington to Collier)
  • Albert Street (Codrington to Amelia)
  • Amelia Street (Ravine to Duckworth) 

Project Features

  • Road reconstruction,
  • Watermain replacement,
  • Sanitary sewer and lateral replacement,
  • Storm sewer installation
  • Sidewalk installation / replacement,
  • Traffic signal replacement,
  • Street lighting replacement

Schedule

Design 2018-2022
Utility Relocations  2022     
​Construction ​2023-2025