Skip Ribbon Commands
Skip to main content
Sign In

Skip Navigation LinksYonge-Street-ROW-Expansion Yonge St ROW Expansion

Yonge Street ROW Expansion: Mapleview to Lockhart

Reconstruction and widening of Yonge Street to 5 lanes, buffered bike lanes and sidewalks between Mapleview Drive and Lockhart Road.

Project Features

  • Replacement of the existing sanitary sewer
  • Replacement of sanitary service laterals from the new sewer to property line
  • Replacement of the existing watermain
  • Replacement of water services from the new watermain to property line
  • Reconstruction and widening of the roadway
  • Elimination of roadside ditches and the additional of curbs and sidewalks'
  • Construction of a new storm sewer system

Schedule

Design 2018
Utility 2019
Construction 2020

Looks like your screen is a bit too small

The page you are attempting to view is not currently compatible with the dimensions of your device. Please visit this page on a larger screen.