Skip Ribbon Commands
Skip to main content
Sign In

Skip Navigation LinksOperations-Centre-Redevelopment-and-New-South-Satellite-Yard-Development Operations Centre Redevelopment & New South Satellite Yard Development

Operations Centre Redevelopment & New South Satellite Yard Development

This multi-year, multi-phase project will renew and maximize the efficiency of existing assets and create the accessory sites and structures required to effectively support the City’s growth and operational service requirements in a timely manner.

Operations Centre (thumbnail)

The Operations Centre Redevelopment (OCR) & New South Satellite Yard Development project will identify and implement the necessary physical changes to support not only current but anticipated future needs of the City’s public Operations including roads maintenance and winter controls, parks operations, traffic operations, fleet operations, rail operations, stormwater operations and solid waste management operations.

As the City of Barrie expands into the Hewitt’s and Salem Secondary Plan areas and begins to densify within the old Barrie boundary, this project will support the increased service demands for various City Operations Departments. 

The primary objectives of this project include:

  • Create an actionable, phased implementation plan for the redevelopment of 165 Ferndale Drive North.
  • Implement the phased construction, relocation and demolition of the structures at 165 Ferndale Drive North to create the most efficient use of resources in support of the day-to-day operational services.
  • Analyze the future growth of Barrie. Select and obtain an appropriate site(s) for auxiliary support services to maximize the efficiency of operational service delivery.

Project Updates

2021

August 2021

City Staff have defined the broad scope for the multi-year, multi-phase project. The due diligence and environmental studies required to support and inform project decisions are underway. A project team is being procured and assembled with the expectation of starting the Validation Phase of the project in Q4.

2020   

A Feasibility Study to better understand the logistics, challenges and opportunities presented by renovating or redeveloping the R.A. Archer Operations Centre was completed.  The study included high level programming exercises to gather as much data on the current situation as well as the future needs to ascertain the gaps between current assets and the expected future service delivery requirements.

Integrated Project Management Approach

An Integrated Project Delivery (IPD) approach will be used for this project to maximize value and minimize time to completion.  Through the IPD approach, a validation process will translate the operational requirements into an actionable plan meeting the identified needs while maintaining flexibility for future growth. The IPD approach brings all project stakeholders together early in the process to collaboratively harness the talents and insights of all participants to optimize the project results, increase value, reduce waste, and maximize efficiency through all phases of design, fabrication, and construction. The outcome of IPD is the opportunity to design, build, and operate as efficiently as possible.

Community Engagement

Check back here for future community engagement opportunities.

Project Schedule and Phasing

Check back here for the full project schedule and phasing once it is endorsed by City Council.


 

Looks like your screen is a bit too small

The page you are attempting to view is not currently compatible with the dimensions of your device. Please visit this page on a larger screen.