Bell Farm Road Transportation Improvements EA

Type
EA Study
Status
Archived

See related design/construction project: Bell Farm Road ROW Expansion 

Status: The Notice of Commencement was published in September 2016. The Notice of Completion was published in July 2017 for the 30-day public review period commencing July 27, 2017.

Consultant: BT Engineering (BTE)

Study Level: Municipal Class EA Schedule 'C'

Purpose: The Multi-modal Active Transportation Master Plan (MMATMP) identified the need for implementing/improving active transportation infrastructure (bicycle and pedestrian facilities), intersection improvements and road widenings. The MMATMP completed Phases 1 and 2 of the Class EA process. These studies developed design alternatives based on the MMATMP recommendations to implement the above noted improvements and completed Phases 3 and 4 of the Class EA process.

Scope: The Study team looked at a number of design alternatives to address the above noted improvements and assess impacts on the physical, natural, social, cultural and economic environments. This process facilitated the decision-making process to identify a preferred alternative design solution.

Key Considerations: Property, driveway and tree impacts.

Reports

Public Information Centres

Public Information Centre #3 
Wednesday May 3, 2017, 4–7 pm
City Hall Rotunda 

The preliminary technically preferred alternatives were presented.  The public was invited to review and provide comments on the technically preferred alternatives. Resources:

Public Information Centre #2
Wednesday, November 23, 2016, 4–7pm
City Hall Rotunda 

The public was invited to review and provide comments on alternative concepts for both projects. 

Public Information Centre #1

The first PIC of the public consultation process outlined transportation projects on a City-wide basis occurred during the development of the Multi-Modal Active Transportation Master Plan.