PRV Chamber Replacement | Welham/Saunders Intersection

Project Type
Roads
Underground Infrastructure
Project #
EN1535
Status
Substantially Completed
Estimated Completion
July 2026

The City is replacing the pressure reducing valve (PRV) chamber located in the intersection of Welham Road and Saunders Road. The PRV chamber is an integral component of the City’s water distribution system that regulates water pressures within the system; the valve in a watermain automatically lowers the incoming high-water pressure to a safer, consistent downstream level to protect plumbing systems and reduce water waste.

Project Updates

July 3, 2026

The storm culvert outlet and handrailing installation at the headwall are complete. The contractor is coordinating final electrical connections for the new PRV. These items are anticipated to be completed within the next two weeks.

Schedule

  • 2025: Detailed design
  • April–July 2026: Construction

Project Features

  • Removed the existing PRV from the middle of the intersection and installed a new PRV chamber outside of the paved surface
  • Commissioned the new PRV chamber
  • Relocated the watermain to accommodate the new PRV location
  • Removed and replaced asphalt as necessary
  • Restored the disturbed areas
Image
Map highlighting the Saunders Road and Welham Road intersection.