Infrastructure Master Planning

The City’s Official Plan provides a foundation for infrastructure master plans. The following infrastructure master plans have been adopted by City Council and provide guidance on many infrastructure projects required for the successful intensification and development of land. The plans are reviewed as part of the asset management planning process. 

Infrastructure Master Plans

Adopted or Last Updated: 2025

Focuses on nine City services areas and the assets that support them, and identifies the proposed levels of service for the City’s assets between 2025 and 2035.
pond
Adopted or Last Updated: 2019

The study area includes the entire City of Barrie excluding the Sophia Creek watershed, Mulcaster drainage area and Annexation Lands (which were studied under separate projects).
Adopted or Last Updated: 2019

Serves as the City’s roadmap in developing a well-balanced transportation network to serve its future needs and development.
Adopted or Last Updated: 2019

Identifies the preferred solution requirements to the year 2041 for collecting and conveying wastewater from homes and businesses to the wastewater treatment facility, with consideration and flexibility for ultimate build-out of Barrie.
Wastewater Treatment Facility aerial photo
Adopted or Last Updated: 2019

Identifies the preferred solution requirements to the year 2041 for treating wastewater collected from homes and businesses before it is discharged to the environment.
water tower
Adopted or Last Updated: 2019

Identifies the preferred solution for delivering potable water to homes and businesses as well as for storing water to meet fluctuating demands throughout the day and to protect the City for fire and emergency purposes.
pipes
Adopted or Last Updated: 2019

Identifies the preferred solution for delivering potable water to homes and businesses as well as for storing water to meet fluctuating demands throughout the day and to protect the City for fire and emergency purposes.

Master Plan Updates Underway

The following Master Plans are being updated through Municipal Class Environmental Assessment (EA) Studies.

Estimated Completion: Spring 2026

Update of the 2019 Transportation Master Plan to accommodate the projected population and employment growth to the year 2051 and beyond. 
water tower
Estimated Completion: Spring 2026

Update of the 2019 Water Supply Master Plan and the 2019 Water Storage & Distribution Master Plan to accommodate the projected population and employment growth to the year 2051 and beyond. 
Wastewater Treatment Facility aerial photo
Estimated Completion: Fall 2025

Update of the 2019 Wastewater Treatment Master Plan and the 2019 Wastewater Collection Master Plan to accommodate the projected population and employment growth to the year 2051 and beyond.