Project Type
Other
Project #
EN1594
Status
Recently Completed
The City replaced four existing retaining walls along Sunnidale Road, extending from Wellington to the Highway 400 bridge. These walls are located in front of residential properties, spanning between driveways. The structures had reached the end of their service life and exhibited significant deterioration. A structural assessment confirmed the walls required full replacement.
Project Updates
August 5, 2026
The project was completed on July 31, 2026.
Schedule
- Design: 2025–2026
- Construction: May–July 2026