Bayview Drive Transportation Improvements

Project Type
Roads
Stormwater & Creeks
Underground Infrastructure
Project #
EN1288
Status
Recently Completed

This project included road widening, cycle tracks, sidewalk work, new watermains and stormwater work on Bayview Drive between Little and Big Bay Point. The work also included resurfacing on Bayview Drive from Little to Springhome.

Project Updates

July 8, 2026

Final pavement markings on Bayview Drive are now complete, marking the official completion of the project. The City extends its appreciation to local residents, businesses, and visitors for their patience, cooperation, and understanding throughout the project.

Project Features

The Big Bay Point Road intersection at Bayview Drive was part of the Harvie Road/Highway 400 Crossing project, completed in June 2021. The improvements to Bayview Drive match the improvements constructed at the intersection and continue north to Little Avenue.

Contracted construction included:

  • Widening the road to include one northbound lane, one southbound lane and a two-way left turn lane in the centre
  • Off-road cycle tracks on both sides of the roadway where possible*
  • Accessible sidewalk on the west side of the roadway
  • Replacement and improvement to local water and sanitary sewer services
  • Stormwater culvert crossing upgrades
  • Stormwater quantity and quality improvements
  • Street lighting upgrades

*This project was redesigned for off-road cycle tracks as much as possible. The dedicated off-road cycle tracks could not be fully achieved throughout the corridor due to property, utility, public transit requirements, existing recreation centre parking, and conflicting use constraints. 

Schedule

TimingStage
2018–2020Undertaking of detailed design and preparation of Tender Ready documents
2021–2022Property Acquisition
2023–2024Utilities
2024Construction Start
2026Construction End
Final asphalt placed in 2026. Most construction was complete by fall 2025.

Access to Businesses/Organizations

Area businesses and organizations remained open during construction, and drivers and pedestrians were directed safely through the construction zone to access local businesses, Innisdale Secondary School, Allandale Recreation Centre, and other organizations in the area. 

A detour was in effect August 2, 2024–July 31, 2025. The road closure allowed for one lane of continuous, one-way traffic southbound on Bayview Drive. Two-way traffic opened as of the evening of July 31, 2025.