Grove Street Watermain Replacement

Project Type
Road Construction
Status
Recently Completed

This project took place on Grove Street, from Nelson Street to Johnson Street. The project included the replacement of the existing 250 mm diameter ductile iron watermain with a 300 mm PVC watermain, including resurfacing.

Project Updates

November 27, 2023 

Construction is now complete. The contractor will return in spring 2024 to clean up some minor deficiencies. We thank every resident on Grove Street East and all adjacent streets for your patience and cooperation during this road reconstruction project.

Project Features

  • New 300 mm PVC watermain.
  • New 25 mm water services to property line.
  • Fully resurfaced road throughout the entire limits of the project.
  • Localized curb and sidewalk replacement (where required).

Schedule

Spring 2023Construction started
Fall 2023Construction completed
Spring 2024Clean-up of minor deficiencies