PRV Chamber Replacement | Livingstone / Osprey Ridge Intersection

Project Type
Roads
Underground Infrastructure
Project #
EN1535
Status
Recently Completed

The City replaced the pressure reducing valve (PRV) chamber located in the northeast quadrant of the Livingstone Street East and Osprey Ridge Road intersection (adjacent to 63 Osprey Ridge Road). 

The PRV chamber is an integral component of the City’s water distribution system that regulates water pressures within the system. 

Project Updates

October 3, 2025 

The project is now completed. The new Pressure Reducing Valve (PRV) chamber has been installed and is functioning. 

All restorations including asphalt paving and sod have been installed. We ask residents to be mindful of the new sod and assist with watering as necessary to ensure it thrives. Thank you for your patience throughout this project. 

For any questions or concerns, please contact the Engineering Contract Administrator, Craig Thompson, at 705-739-4220 x4887 or Craig.Thompson@barrie.ca

Schedule

  • 2024–2025: Detailed design
  • July–September 2025: Construction

Project Features

The contractor, Avertex:

  • Removed and replaced the existing PRV chamber
  • Commissioned the new PRV chamber
  • Replaced the water services at specific residences
  • Removed and replaced asphalt on Osprey Ridge Road east of Livingstone Street for approximately 30m
  • Restored the disturbed areas