Essa Road New Transmission Watermain & Road Expansion

Project Type
Roads
Status
In Progress
Estimated Completion
TBD

This transportation improvement project along Essa Road in southwest Barrie extends from Coughlin Road to north of Mapleview Drive West. The Mapleview Drive and Essa Road intersection is not included in this project.

The scope of work includes the design of a multi-use trail, concrete sidewalk and curb, 5 lanes to match Essa Road north of Coughlin Road, and local stormwater management improvements.

Image
Essa transmission watermain

Project Updates

May 1, 2023

Hatch provided a comment matrix to the City in April and is finalizing the final deliverables prior to placing the project on hold until 2026.

Project Features

The design concept includes:

  • A combination of traditional and modern stormwater management solutions such as low-impact development structures and a new stormwater management pond.
  • New and improved 2m wide sidewalk and 3m wide multi-use trail to connect existing multi-modal transportation methods north of Coughlin Road and along Mapleview Drive West.
  • Construction of 2 lanes each direction for north and southbound traffic.
  • A continuous centre turn lane for the length of the improvement project.
  • Concrete curb and gutters.
  • Minimizing property impacts through design mitigation and refinements.

Schedule

TimingStage
2022Finalization of detailed design (90%)
2026Property
2027Finalization of detailed design and preparation of tender ready document
2027Utilities
2028Construction Start