This CLASS EA Phases 3 & 4 addressed transportation improvements for the McKay Rd East - Highway 400 Interchange, Lockhart Rd/Salem Rd Crossing and Associated Works to determine the most appropriate design for future reconstruction projects, as recommended in the City’s Multi-Modal Active Transportation Master Plan.
Status: Study was initiated in 2015. The Notice of Completion was posted in December 2017 for the 45-day public review period commencing December 21, 2017.
Consultant: WSP / MMM Group Ltd
Study Level: Municipal Class EA Schedule C.
Purpose: To consider design alternatives and establish the preferred recommended design alternative for transportation improvements on McKay Road East - Highway 400 Interchange, Lockhart Road/Salem Road Crossing and Associated Works
Scope: The City looked at a number of design alternatives associated with implementing transportation improvements. The impact of transportation improvements on physical, natural, social, cultural and economic environments was also looked at during the study.
Key Considerations: Impacts on property, driveway and trees within the study area
Public Information Centres
Report & Appendices
- McKay Rd IC and Salem Lockhart Class EA ESR FINAL December 2017
- Chapter 5 Preliminary Design Plates and Profiles
- Appendix A Salem Reservoir and Pumping Station Technical Memorandum
- Appendix B MTO Highway 400 TESR Update Preliminary Design Excerpt
- Appendix C Natural Heritage Review Supporting Information
- Appendix D Drainage and Stormwater Management Report
- Appendix E Detailed Assessment Tables
- Appendix F Traffic Memoranda
- Appendix G Ultimate McKay Road Interchange Design Concept
- Appendix H Utility Conflict Plan
- Appendix I Conceptual Design – Salem Road and McKay Road Trunk Watermain and Sanitary Sewer
- Appendix J Preliminary Cost Estimate
- Appendix K Consultation PART 1
- Appendix K Consultation PART 2
- Appendix K Consultation PART 3
- Appendix L Noise Analysis
- Appendix M Tree Assessment