The City of Barrie installed a new guiderail on Hurst Drive, from Brennan Avenue to 60m southeast, in August 2024. This project was done to enhance safety for area residents, pedestrians and motorists. The contract was awarded to Peninsula Construction Inc.
This work was part of City of Barrie’s Council approved 2024 budget and aligns with the goal from Council’s strategic priorities to update infrastructure and improve roadway safety throughout Barrie.
Project Features
Construction included:
- Installing 60 metres of single steel beam guiderail.
- Installing two terminal systems at each end of the guiderail to protect motorists.
- Restoring disturbed boulevards, curbs, sidewalks, and roadways.