Municipal Infrastructure Projects

The work of the City's Corporate Asset Management, Development Services, and Infrastructure departments each impact various design and construction projects across Barrie. Corporate Facilities' planning and development staff oversee facility projects that support select City services.

Construction projects may require road closures.

Generally speaking, infrastructure projects are informed by a master plan or planning process, and project cycles may include environmental assessment studies, detailed design, then construction. Projects are ordered below as per the latest update.

2026 infrastructure projects map

Aerial view of a long road lined with greenery, leading towards a distant city skyline.
Type: Roads; Stormwater & Creeks; Underground Infrastructure
Status: Recently Completed

Completed in July 2026. Construction included lane widening, infrastructure replacements, new bike lanes, and a new sidewalk.
Type: Roads; Stormwater & Creeks
Status: In Progress
Estimated Completion: Fall 2028

MTO is constructing a new bridge at the crossing of Dunlop Street over Highway 400.
Aerial view of roads in a green residential area near a lake on a sunny day.
Type: Roads; Underground Infrastructure
Status: Substantially Completed

Reconstructed Eugenia Street (Berczy to Duckworth), Albert Street (Eugenia to Codrington) & Dundonald Street (Eugenia to Codrington), as well as the infrastructure in Barrie's Wellington D1 neighbourhood.
Aerial view of sites one and two, with red boxes outlining areas
Type: Stormwater & Creeks
Status: In Progress
Estimated Completion: 2026

Sites include Kidds Creek at Donald Street and Mapleview Drive East near the Bayview Drive DOLRA.
diagram: layers of a road
Type: Roads
Status: In Progress

The annual Pavement Management Program includes resurfacing roads, which mainly involves the repair of defects, such as cracks, and rutting found in the top layers of the road.
Aerial view of two roads surrounded by green trees and scattered houses.
Type: Roads; Stormwater & Creeks; Underground Infrastructure
Status: In Progress
Estimated Completion: Spring 2028

Reconstructing and widening of Yonge Street (Mapleview to Lockhart) to five lanes, a cycle-track and a sidewalk.
Icon: Construction Worker
Type: Roads
Status: In Progress
Estimated Completion: September 2026

A holding strategy is a reactive approach to pavement management, generally applicable to roads proposed for construction in future years of the Capital Plan.
Icon: Construction Worker
Type: Roads; Underground Infrastructure
Status: In Progress
Estimated Completion: Fall 2026

The annual program includes installing new watermains and lining existing watermains.
A construction site showing a dug out trench with a long white pipe reaching from the trench into the back of a truck.
Type: Underground Infrastructure
Status: In Progress
Estimated Completion: Fall 2027

This project involves lining 1,400 metres of an existing 500 mm diameter concrete pressure pipe watermain on Huronia Road between Big Bay Point Road and Little Avenue due to deterioration.
Map highlighting the Saunders Road and Welham Road intersection.
Type: Roads; Underground Infrastructure
Status: Substantially Completed
Estimated Completion: July 2026

Replacement of the pressure reducing valve (PRV) chamber located in the intersection of Welham Road and Saunders Road.